Limited Time Offer Get 50% Discount on your order

X
POWERSHIELD Centurion RT 6000VA Long run model Sale!

POWERSHIELD Centurion RT 6000VA Long run model

$6,729.05 $214.64

POWERSHIELD Centurion RT 6000VA Long run model. True On-line double conversion. Rack/Tower UPS. NO BATTERIES. Includes large internal charger. The Centurion RT features true online double conversion. As our highest single phase power density UPS, this soph

  • Unconditional Satisfaction Guarantee
  • No Shipping Fees Above 30
  • 2 Months to Decide. Returns Simplified.
Quantity:
- +
SKU: W524600172380
Category:

POWERSHIELD Centurion RT 6000VA Long run model. True On-line double conversion. Rack/Tower UPS. NO BATTERIES. Includes large internal charger.

The Centurion RT features true online double conversion. As our highest single phase power density UPS, this sophisticated range will provide the most comprehensive protection for mission-critical devices such as sensitive networks, computers, servers, telecom applications, as well as industrial applications. Meticulously developed by PowerShield engineers to be a world-leading technology UPS, the Centurion RT addresses absolutely all requirements and features as has been demanded by the sophisticated Australian power consumer and hence stands in a class of its own, as a world-leading UPS technology.

Features:

  • Exceptional surge protection
  • Unity output power factor (PF=1)
  • Informative & easy-shift LCD display
  • ECO & advanced ECO mode
  • Standard extra large charger
  • Hot-swappable batteries
  • Rack/Tower design
  • Emergency Power Off Function (EPO)

Downloads

  • PSCERT6000L

Reviews

There are no reviews yet.

Be the first to review “POWERSHIELD Centurion RT 6000VA Long run model”

Your email address will not be published. Required fields are marked *

  • Cost - $25

  • Free Shipping We offer free shipping on orders over $30. Please check the free - shipping eligibility at checkout.

  • Delivery Time It usually takes [3-5] business days for standard shipping. Please note that this is an estimated time frame and may be affected by local holidays, and unforeseen circumstances.